Page 376 - Full GAP Catalogue 2022
P. 376

374 / Terms & Conditions



        properly supervised in situations  where  the  young, elderly or mentally   (iii) We may recommend Edge protection in our CAD Design which includes
        or physically disabled (whether  temporarily  through drink or drugs or   toe boards, trench sheets or box sides even with this equipment in place
        otherwise) are or are likely to use the Equipment. You will be responsible   you should still ensure that appropriate head protection is worn and that
        for making good any damage or loss caused to the Equipment or to any   edges of excavations are protected with substantial barriers.
        third party property which occurs as a result of this failure.  (iv) You are responsible for ensuring inspection of the evacuation site is
                                                              carried out by a competent person who  fully understands the dangers
        (ii) We will ordinarily service the Equipment once a week (or as otherwise   and necessary precautions each day and that plant and machinery is not
        agreed in writing). We will not be required to service the Equipment if it   parked near to the evacuation site.
        has been moved without our consent. It is your responsibility to contact us
        if weather conditions have affected your site, which are likely to prevent us   (v)  Any  faults  that are  found  with  the Equipment provided should be
        carrying out the service. You should ensure that the Equipment is fixed to   corrected immediately and reported to us. We provide a temporary works
        the ground so that it cannot be removed or fall over. Where the Equipment   design only service and take no responsibility for the failure of that design
        provided is a portable toilet it is offered in accordance with BS6465 and   in use. You are responsible for the safety of and the implementation of
        any relevant subsequent standards. We recommend a ratio of 1 toilet to 7   the design on site. The design we have provided should not be used if site
        persons where weekly servicing is provided and accept no liability where   conditions have changed, or if we have not been provided with all relevant
        this recommendation is not followed. Any recommendation we informally   information  or  if  on  inspection  it  has  not produced  a  stable  and  safe
        make about  the amount of Equipment you may require does not  form   working space.
        part of the contract between us. It is your responsibility to ensure that
        all persons using the Equipment are fully aware that the water provided   (vi) For the avoidance of doubt if you do not instruct our CAD Design service
        as part of the Equipment (if any) is not potable. It is your responsibility to   then all trenching shoring equipment is provided on a hire only basis and
        ensure that any water used in connection with the operation of the facility   we cannot advise on the type or quantity required.
        provided  is  free  of  contamination  including  water borne  diseases.  It  is
        your responsibility to ensure that all other contamination (including but   17. LOCATION OF EQUIPMENT
        without limitation), needles, sharps, and other waste products or foreign
        objects are removed from the Equipment before it is returned to us. (We   Equipment  must  not  be  removed  without  our  authority  from  any  site
        will charge you any costs we incur in restoring the Equipment to a clean   originally specified by you or from any site we subsequently authorise.
        state if this clause is not complied with). It is your responsibility to ensure   Where we give authority for you to re-hire the Equipment to a third party,
        that the Equipment is not used after the termination of the hire period.  you are deemed to retain control of the Equipment from us whether or not
                                                              it might remain in your possession. You shall be solely responsible for the
        16. PROVISIONS RELATING TO TRENCHING AND SHORING EQUIPMENT  payment of all hire charges and liability incurred.

        (i) If  we provide a CAD Design service  for  your  Trenching and Shoring   18. LIMITS OF OUR LIABILITY-  YOUR  ATTENTION IS PARTICULARLY
        project  you  will be responsible  for providing us  with all information   DRAWN TO THIS CLAUSE
        which could be relevant to the design. This includes but is not limited to
        details of the ground conditions on the site, the soil type and angle of any   (i) We will not be liable for any delays caused by any circumstances beyond
        slope, a geotechnical report including, but not limited to soil pressures,   our reasonable control.
        the locations of any underground structures, water courses or existing
        services in the area, location of scaffold footings, buried services or the   (ii) We will not be liable for any indirect consequential or special loss, loss
        foundations of nearby buildings or walls adjacent to the site, operational   of business, profits, goodwill, contracts, revenues, savings you expected to
        activities and vehicular movement. You are responsible for ensuring the   make, wasted money, wages, fees or expenses, due to late delivery, non-
        accuracy of all information about the site and of any measurements you   delivery, unsuitability, breakdown or stoppage of the Equipment or any
        provide. Surveys of the foundations and the advice of a structural engineer   part of it, even if you have advised us of the possibility of such loss or
        may be required in addition to any CAD Design we provide and you should   damage.
        instruct this separately.
                                                              (iii) Nothing in these terms and conditions shall exclude us from liability
        (ii)  You are responsible  for insuring  that  when implementing any CAD   for death  or personal  injury caused  by our  negligence,  fraudulent
        Design  we provide  that before digging any  trench pit,  tunnel, or other   misrepresentation or any other type of liability which cannot be excluded
        excavations, you have the necessary temporary support and all Equipment   or limited by operation of law.
        including (trench sheets, props, baulks etc.) are available on site before
        work starts.                                          (iv) Our total Liability to you whether in Contract, tort, statutory breach
                                                              of duty or otherwise, arising under or in connection  with  the contract
   371   372   373   374   375   376   377   378   379   380   381